Data Centres - UKS South

Power Specification

Utility supply 3.8MVA 11kV supply delivered via dual cable arrangement
Customer supply 230V or 400V to the latest version of IEC 60038
Backup UPS Three units in-line to protect customer equipment during transfer to generators
Generators N+1 Diesel generator configuration located within facility
Generator Autonomy 1 week at 75% load with fuel supply agreements

Environmental Specification

Cooling N+1 Cooling Capability
Monitoring Sensor grid linked to NOC
Fire Detection Multiple 7.5m radius detection zones with both ionisation and optical detectors in roof, data floor and raised floor VESDA aspirating smoke detectors
Fire Suppression FM-200® Heptafluoropropane agent
Security Full alarm system monitored 24x7
PAC access control system with audit logs and formal documented site access policy
Internal and external CCTV with 90 days of motion activated capture


Other Network Provision

Roof Space Apparatus for satellite and radio equipment subject to planning
On-site Fibre Providers BT (Stratford, Ipsley & Redditch Headless Cross exchanges), Virgin Media [ntl & Telewest connections] (Studley, Bromsgrove & Kings Norton exchanges) Deliveries via independent ducts from public highway
Telecommunications Access BT and ntl:Telewest (Fibre, Copper and SDH), Global Crossing (Fibernet) via Birmingham, Telehouse East or Sovereign House POPs, Interconnect to carriers present in Redbus III and Telehouse East via UKS POP's

 

 